Final | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/17/2002 at 16:38:28. Contact: ###-####. ok 10/18/2002 2:58:09 PM
|
Electrical Rough-In | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PASS |
Jack Frank
|
|
|
###-#### ok 8/28/2002 12:03:51 PM
|
Final | 8/26/2002 | 8/27/2002 | 8/27/2002 | A | NR |
Jack Frank
|
|
|
Phone #: ###-#### needs make up done and 11/4 protection for cables 8/27/2002 2:36:48 PM
|