Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:55:56. Contact: ###-####. ok 9/25/2002 4:32:28 PM
|
Electrical Rough-In | 9/13/2002 | 9/16/2002 | 9/16/2002 | A | NH |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/13/2002 at 16:16:49. Contact: ###-####. left note 9/16/2002 9:51:46 AM
|
Electrical Rough-In | 9/16/2002 | 9/16/2002 | 9/16/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 10:46:38. Contact: ###-####. r/i ok 9/16/2002 6:42:11 PM
|
Electrical Rough-In | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/16/2002 at 08:17:58. Contact: ###-####. part walls and ceiling N W bed rm 8/16/2002 4:29:10 PM
|