Final | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | PASS |
Joe Ray
|
|
|
|
Final | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 10:19:59. Contact: ###-####.
final ok
10/22/2002 5:40:05 PM
|
Electrical Rough-In | 8/23/2002 | 8/26/2002 | 8/26/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 16:11:34. Contact: ###-####.ri/ok
ps/ug/new/ok 8/26/2002 12:02:42 PM
|
Rough-In Permanent Service | 8/23/2002 | 8/26/2002 | 8/26/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 16:12:14. Contact: ###-####.ri/ok
ps/ug/new/ok 8/26/2002 12:03:35 PM
|