Final | 12/4/2002 | 12/5/2002 | 12/5/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 19:32:02. Contact: ###-####. ok 12/5/2002 6:17:48 PM
|
Permanent Service | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 20:26:16. Contact: ###-####.
p/s o/h rec. ok 9/11/2002 10:30:55 AM
|
Electrical Rough-In | 9/9/2002 | 9/9/2002 | 9/9/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 11:06:26. Contact: ###-####. r/i ok 9/9/2002 7:07:47 PM
|
Electrical Rough-In | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PART |
Jack Frank
|
|
|
###-#### CONFERENCE ok met with owner, Jessie 8/27/2002 5:01:55 PM
|