Final | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PASS |
Pat Lass
|
|
|
###-####
|
Final | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | NR |
Pat Lass
|
|
|
###-#### burry pipe 10/15/2002 3:35:09 PM
|
Electrical Rough-In | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | PASS |
Tim McCullough
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
ri/ok/ 9/5/2002 8:38:39 AM
|
Electrical Rough-In | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | NR |
Pat Lass
|
|
|
CONFERENCE ###-#### call to meet there
had Conf. 8/28/2002 10:06:04 AM
|