Final | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Joe Ray
|
|
|
CORRECTION WAS MADE; READY FOR FINAL; ACCESS CAN BE GAINED WITH KEY ABOVE FRONT DOOR.; Phone #: ###-#### Internet Inspection Request from: KATHY BYNUM
|
Final | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | FAIL |
Joe Ray
|
|
|
Ready for Final Inspection. General Contractor says workers are there all day so you should have no troubles gaining access. If they have left before you get there there is a key above the door or call me at ###-####.
; Phone #: ###-#### Internet Inspection Request from: KATHY BYNUM water pipe bond not connected 12/13/2002 1:59:35 PM
|
Final | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | FAIL |
Joe Ray
|
|
|
Someone from Rocky Mountain CTR is to be there to let you in. If you find the door looked they do leave a key above the door which you can use to gain access.; Phone #: ###-#### Internet Inspection Request from: KATHY BYNUM not ready 12/9/2002 9:18:43 AM
|
Electrical Rough-In | 10/16/2002 | 10/17/2002 | 10/17/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/16/2002 at 10:25:42. Contact: ###-####.
|
Rough-In Permanent Service | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 10:47:04. Contact: ###-####. p/s ug r ok / fire at house no one living on site 8/29/2002 3:18:32 PM
|