Final | 3/11/2003 | 3/11/2003 | 3/11/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 9:32:52 AM. Contact: ###-####. ok 3/11/2003 4:12:33 PM
|
Final | 3/3/2003 | 3/3/2003 | 3/3/2003 | A | FAIL |
Jack Frank
|
|
|
correction not made called contractor will correct and call for final
|
Final | 1/3/2003 | 1/3/2003 | 1/3/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 08:53:29. Contact: ###-####. shall not ID #6 or smaller equip grd, shhall be green if insulated250.119 called 1/3/2003 3:36:55 PM
|
ELE-Aging Inspection | 12/27/2002 | 12/27/2002 | 12/27/2002 | | FAIL |
Jack Frank
|
|
|
called contractor stopped at job site cor. posted 250.122(B) eqiup grd shall be same size as phase conductors ,250.86 install bond bushing conduit at pole or replace with schedule 80 pvc, shall not use ss connector in place of chase nipple 12/27/2002 6:10:55 PM
|
Rough-In Permanent Service | 9/5/2002 | 9/5/2002 | 9/5/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 10:35:41. Contact: ###-####.
p/s u/g new ok 9/6/2002 9:37:45 AM
|