Final | 1/22/2003 | 1/22/2003 | 1/22/2003 | P | PASS |
Pat Lass
|
|
|
###-#### kathy this inspection is for both 1405 and 1409 main thanxs
|
Electrical Rough-In | 11/19/2002 | 11/19/2002 | 11/19/2002 | P | PASS |
Pat Lass
|
|
|
R/I of no/west corner ok
|
Final | 11/18/2002 | 11/19/2002 | 11/19/2002 | P | CANC |
Pat Lass
|
|
|
COVER INSPECTION FOR WEST CORNER OF OFFICE BUILDING, PART NOT PREVIOUSLY INSPECTED; Phone #: ###-#### Internet Inspection Request from: KATHY BYNUM
not a final 11/19/2002 3:41:21 PM
|
Final | 10/31/2002 | 11/1/2002 | 11/1/2002 | A | PART |
Pat Lass
|
|
|
REINSPECTION FOR FLOOR BOXES IN ORDER TO GAIN TEMPORARY OCCUPANCY; Phone #: ###-#### Internet Inspection Request from: KATHY BYNUM
two covers for floor boxes and panels closed up remain. 11/1/2002 8:51:49 AM
|
Final | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | NR |
Pat Lass
|
|
|
INSPECTION IS FOR TENANT SPACE @ 1405 MAIN; Phone #: ###-#### Internet Inspection Request from: KATHY BYNUM
floor boxes not trimmed out 10/30/2002 11:05:12 AM
|
Electrical Rough-In | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 13:36:34. Contact: ###-####.
Ok to cover ceiling except where makeup is required. 10/25/2002 10:10:45 AM
|
Electrical Rough-In | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 10:17:26. Contact: ###-####. ceiling - ok 10/23/2002 10:06:11 AM
|
Electrical Rough-In | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 15:47:43. Contact: ###-####.
wall by panel ok 10/9/2002 11:38:19 AM
|
Electrical Rough-In | 10/4/2002 | 10/7/2002 | 10/7/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/04/2002 at 13:42:53. Contact: ###-####.
front soffit ok 10/7/2002 10:47:24 AM
|
Electrical Rough-In | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 11:36:27. Contact: ###-####.
Hard ceilings ok 10/4/2002 9:06:21 AM
|
Electrical Rough-In | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 10:46:40. Contact: ###-####.
|
Electrical Rough-In | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 11:54:40. Contact: ###-####.
ri/front& back lav 9/30/2002 10:25:30 AM
|
Electrical Rough-In | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 09:15:53. Contact: ###-####.
walls on except small protion on south side 9/17/2002 9:58:23 AM
|
Electrical Rough-In | 9/9/2002 | 9/11/2002 | 9/11/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 15:25:04. Contact: ###-####.
east side ok 9/11/2002 10:58:34 AM
|