Final | 10/31/2002 | 11/1/2002 | 11/1/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/31/2002 at 13:18:35. Contact: ###-####.
|
Electrical Rough-In | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | CANC |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 08:41:49. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/28/2002 at 09:25:45.
|
Final | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | PART |
Joe Ray
|
|
|
temp/occup ok 10/18/2002 11:12:40 AM
|
Electrical Rough-In | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/16/2002 at 08:21:54. Contact: ###-####. ceiling ok for cover 10/16/2002 3:04:19 PM
|
Electrical Rough-In | 9/6/2002 | 9/6/2002 | 9/6/2002 | P | PASS |
Joe Ray
|
|
|
JIM ###-#### r/i walls ok for cover 9/6/2002 2:38:04 PM
|