Final | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 09:30:23. Contact: ###-####.
Switches ok did not inspect existing electrical
final ok for work done 10/9/2002 1:30:59 PM
|
Electrical Rough-In | 9/19/2002 | 9/19/2002 | 9/19/2002 | P | PASS |
Pat Lass
|
|
|
Wall r/I ok 9/19/2002 12:15:06 PM
|
Rough-In Permanent Service | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/18/2002 at 16:33:36. Contact: ###-####.
|
Electrical Rough-In | 9/18/2002 | 9/18/2002 | 9/18/2002 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/18/2002 at 09:30:22. Contact: ###-####.
Protection of mc and ent
tried to call got no answer 9/18/2002 2:06:41 PM
|