Final | 10/9/2003 | 10/9/2003 | 10/9/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/9/2003 at 9:06:16 AM. Contact: ###-####.
|
Final | 10/6/2003 | 10/7/2003 | 10/7/2003 | P | NH |
Joe Ray
|
|
|
keith ###-#### left note 10/7/2003 4:02:04 PM
|
Rough-In Permanent Service | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 13:20:20. Contact: . p/s ug r ok 10/3/2002 10:06:32 AM
|
Electrical Rough-In | 9/25/2002 | 9/26/2002 | 9/26/2002 | P | PASS |
Joe Ray
|
|
|
conf only\\###-####
|