Final | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | PASS |
Joe Ray
|
|
|
SHERLY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Final | 9/26/2002 | 9/27/2002 | 9/27/2002 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 13:43:28. Contact: ###-####. 300-5 depth of trench/406-8 in use cover for recpt/110-3 manuf specs #6 cu wire 9/27/2002 2:38:25 PM
|