Final | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 3:24:45 PM. Contact: ###-####. ok final 2/24/2003 10:37:09 AM
|
Rough-In Permanent Service | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 11/06/2002 at 16:30:02. Contact: ###-####.
ri/ok
ps/ug/new/ok 11/7/2002 10:55:04 AM
|
Electrical Rough-In | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Tim McCullough
|
|
|
FOR TRENCH INSP ALLEN -###-####
ok/cover 10/4/2002 10:08:01 AM
|