Final | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 10:39:44. Contact: ###-####.
final/ok 12/24/2002 10:50:30 AM
|
Final | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/17/2002 at 13:01:25. Contact: ###-####. no access doors locked 12/18/2002 10:25:32 AM
|
Electrical Rough-In | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/13/2002 at 14:42:14. Contact: ###-####. ok for cover /shade with 6 inches of sand 11/14/2002 8:56:35 AM
|
Rough-In Permanent Service | 10/14/2002 | 10/16/2002 | 10/16/2002 | P | PASS |
Joe Ray
|
|
|
###-#### p/s ug n ok 10/16/2002 3:13:37 PM
|