Final | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 10:39:16. Contact: ###-####.
final/ok 12/24/2002 10:50:47 AM
|
Final | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/17/2002 at 13:01:58. Contact: ###-####. no access doors locked 12/18/2002 10:26:05 AM
|
Electrical Rough-In | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/13/2002 at 14:42:52. Contact: ###-####. ok for cover /shade with 6 inches of sand 11/14/2002 8:57:22 AM
|
Rough-In Permanent Service | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PASS |
Joe Ray
|
|
|
###-#### 10/15/2002 11:43:13 AM p/s ug n ok 10/16/2002 8:43:11 AM
|
Rough-In Permanent Service | 10/14/2002 | 10/15/2002 | 10/15/2002 | P | CANC |
Jim Schmer
|
|
|
###-####
|