Final | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/12/2002 at 10:30:02. Contact: ###-####.
|
Final | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | FAIL |
Pat Lass
|
|
|
###-#### support J box 12/9/2002 1:36:03 PM
|
Electrical Rough-In | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 16:27:05. Contact: ###-####. potting for light in spa 11/12/2002 10:17:06 AM
|
Electrical Rough-In | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | PASS |
Jim Schmer
|
|
|
SPA BONDING KATHY ###-####
|