Final | 12/18/2002 | 12/18/2002 | 12/18/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 07:49:48. Contact: ###-####. ok 12/18/2002 2:35:40 PM
|
Electrical Rough-In | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | PASS |
Jack Frank
|
|
|
###-#### ok there will be electric heat in the floor of the bathroom 10/15/2002 5:54:44 PM
|