Final | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 11:37:00. Contact: ###-####.
|
Final | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | FAIL |
Pat Lass
|
|
|
###-#### teresa
baseboard disconnect 11/8/2002 9:51:46 AM
|
Final | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | NH |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/06/2002 at 16:52:43. Contact: ###-####.
NALC called and left message 11/7/2002 9:12:19 AM
|
Electrical Rough-In | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/15/2002 at 14:10:36. Contact: ###-####.
|