Final | 10/23/2002 | 10/23/2002 | 10/23/2002 | P | PASS |
Pat Lass
|
|
|
|
Final | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | NR |
Pat Lass
|
|
|
###-#### 10/21/2002 2:11:56 PM
Had conf. 10/22/2002 9:56:12 AM
|
Electrical Rough-In | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | NR |
Pat Lass
|
|
|
late pm ###-####
|
Electrical Rough-In | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | FAIL |
Pat Lass
|
|
|
Key in mailbox ###-#### 10/17/2002 7:36:03 open walls covered prior to inspection install proper bathroom recep. 10/17/2002 10:20:56 AM
|