Final | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 20:54:10. Contact: ###-####.
|
Electrical Rough-In | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung kit only 11/8/2002 5:01:52 PM
|
Electrical Rough-In | 10/23/2002 | 10/24/2002 | 10/24/2002 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 13:51:27. Contact: ###-####. no access called 10/24/2002 10:55:40 AM
|
Electrical Rough-In | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 11:15:58. Contact:
call 1hr. prior to meet there ###-#### ok 10/24/2002 3:53:46 PM
|
Electrical Rough-In | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 15:32:16. Contact: ###-####. garage ok for cover , basement failed cor. posted 210.52(A) required outlets where new walls and doors are , and 300.4(D) 11/4 inches for cables called 10/23/2002 2:24:25 PM
|
Electrical Rough-In | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | NH |
Jack Frank
|
|
|
basement and garage ###-#### notice posted called left message 10/22/2002 12:36:46 PM
|