Final | 2/18/2003 | 2/19/2003 | 2/19/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 1:46:33 PM. Contact: ###-####.
|
Electrical Rough-In | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 09:43:26. Contact: ###-####.
ri/ok 11/1/2002 5:27:00 PM
|
Electrical Rough-In | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 09:43:26. Contact: ###-####.
ri/ok 11/1/2002 5:45:45 PM
|
Permanent Service | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Pat Lass
|
|
|
###-####
P/S U/G R OK 10/24/2002 1:50:33 PM
|