Temporary Service | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | PASS |
Tim McCullough
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ts/ok/oh 10/28/2002 4:46:31 PM
|
Temporary Service | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | PASS |
Tim McCullough
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ts/ok/oh 10/28/2002 4:46:31 PM
|
Temporary Service | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | FAIL |
Pat Lass
|
|
|
chris ###-####
110.12 Mechanical Execution of Work.
(C) Integrity of Electrical Equipment and Connections. Internal parts of electrical equipment, ……. shall not be damaged or contaminated
250.92 Services.
(A) Bonding of Services. The non-current-carrying metal parts of equipment indicated in 250.92(A)(1), (2), and (3) shall be effectively bonded together.
250.53 Grounding Electrode System Installation.
G) Rod and Pipe Electrodes.
where rock bottom is encountered, the electrode shall be driven at an oblique angle not to exceed 45 degrees from the vertical
10/25/2002 1:16:11 PM
|