Final | 2/10/2003 | 2/10/2003 | 2/10/2003 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 2/10/2003 at 8:33:33 AM. Contact: ###-####. ok final 2/10/2003 4:31:08 PM
|
Electrical Rough-In | 11/7/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 16:21:01. Contact: ###-####.
ri/ok 11/8/2002 2:55:40 PM
|