Final | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PASS |
Pat Lass
|
|
|
please call before inspection ###-####//jeff
|
Final | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 10:27:08. Contact: ###-####.
P/S O/H R Ok 11/1/2002 2:18:53 PM
|
Electrical Rough-In | 10/30/2002 | 10/31/2002 | 10/31/2002 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 15:12:02. Contact: ###-####.
n 10/31/2002 1:17:12 PM
|