Final | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 9:47:38 AM. Contact: ###-####.
|
Electrical Rough-In | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 10:46:37. Contact: ###-####.
ceiling ok 1/30/2003 3:17:16 PM
|
Final | 1/29/2003 | 1/30/2003 | 1/30/2003 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/29/2003 at 2:33:27 PM. Contact: ###-####.
all existing will be supported
allowed 4 ft center existing strut for support of emt 1/30/2003 11:12:01 AM
|
Electrical Rough-In | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 10:22:26. Contact: ###-####.
walls on first floor east building ok 12/10/2002 3:01:50 PM
|