Final | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | PASS |
Pat Lass
|
|
|
harold; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Electrical Rough-In | 11/20/2002 | 11/20/2002 | 11/20/2002 | P | PASS |
Joe Ray
|
|
|
loren; Phone #: ###-#### Internet Inspection Req
uest from: Marsha
wall r/i ok 11/20/2002 11:37:55 AM
|
Electrical Rough-In | 11/19/2002 | 11/19/2002 | 11/19/2002 | P | FAIL |
Pat Lass
|
|
|
LORREN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
300.18 Raceway Installations.
(A) Complete Runs. Raceways, other than busways or exposed raceways having hinged or removable covers, shall be installed complete between outlet, junction, or splicing points prior to the installation of conductors
314.29 Boxes and Conduit Bodies to Be Accessible.
Boxes and conduit bodies shall be installed so that the wiring contained in them can be rendered accessible without removing any part of the building
300.14 Length of Free Conductors at Outlets, Junctions, and Switch Points.
300.4 Protection Against Physical Damage.
Where subject to physical damage, conductors shall be adequately protected.
300.11 Securing and Supporting.
(C) Cables Not Used as Means of Support. Cable wiring methods shall not be used as a means of support for other cables, raceways, or nonelectrical equipment.
11/19/2002 3:11:06 PM
|