Final | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/10/2003 at 12:05:54 PM. Contact: ###-####. ok final 3/11/2003 8:50:41 AM
|
Final | 3/5/2003 | 3/6/2003 | 3/6/2003 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 1:14:04 PM. Contact: ###-####. corrections nec 406.8 (front oulet), 410.4 (bathtub master), & 210.52(3)(C) (dinning rm) 3/6/2003 9:32:49 AM
|
Rough-In Permanent Service | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/25/2002 at 10:56:55. Contact: ###-####. ok cover ri p/s u/g n ok 11/25/2002 5:09:44 PM
|