Final | 1/29/2003 | 1/30/2003 | 1/30/2003 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/29/2003 at 15:00:55. Contact: ###-####. ok card signed 1/30/2003 12:38:39 PM
|
Electrical Rough-In | 1/29/2003 | 1/30/2003 | 1/29/2003 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/29/2003 at 2:52:22 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/29/2003 at 14:59:41.
|
Final | 1/29/2003 | 1/29/2003 | 1/29/2003 | A | PART |
Jack Frank
|
|
|
called needs gfci for all kit outlets 210.8 (B)(3) 1/29/2003 9:09:56 AM
|
Final | 1/29/2003 | 1/29/2003 | 1/29/2003 | P | NR |
Jack Frank
|
|
|
###-#### brad will reschedule 1/29/2003 2:04:13 PM
|
Rough-In Permanent Service | 1/28/2003 | 1/28/2003 | 1/28/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 09:16:35. Contact: ###-####.
P/S U/G N Ok 1/28/2003 1:42:12 PM
|
Electrical Rough-In | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/24/2003 at 09:47:30. Contact: ###-####. Brad will reschedule 1/24/2003 2:40:57 PM
|
Electrical Rough-In | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/17/2003 at 09:33:00. Contact: ###-####. cor. made ceiling ok 1/17/2003 3:32:35 PM
|
Electrical Rough-In | 1/14/2003 | 1/15/2003 | 1/15/2003 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/14/2003 at 16:00:38. Contact: ###-####. electrical contractor ok ,low voltage wiring failed, cor. posted to BLD02-02012, 300.4, 300.11, 300.15 (C) 1/15/2003 11:57:10 AM
|
Electrical Rough-In | 1/10/2003 | 1/10/2003 | 1/10/2003 | P | PART |
Jack Frank
|
|
|
CONFERENCE ONLY ###-#### BRAD PLEASE CALL 1ST ok 1/10/2003 4:40:20 PM
|
Electrical Rough-In | 12/26/2002 | 12/27/2002 | 12/27/2002 | P | PART |
Jack Frank
|
|
|
###-####
walls only 12/27/2002 1:44:47 PM
|
Electrical Rough-In | 12/9/2002 | 12/10/2002 | 12/10/2002 | A | PART |
Jack Frank
|
|
|
CONFERENCE ONLY ###-#### RON PLEASE CALL 1ST u/g ok 12/10/2002 11:40:59 AM
|
Electrical Rough-In | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/09/2002 at 09:42:53. Contact: ###-####. t/w brad regarding depth of conduit he to meet jack tomorrow am regarding cover nec 300.5 24inch parking lot & 18inch flower beds 12/9/2002 2:37:07 PM
|
Electrical Rough-In | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 16:11:11. Contact: ###-####. u/g for ID power and phone we do not inspect that , and was not done by electrical contractor 12/5/2002 10:55:11 AM
|
Electrical Rough-In | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 11:44:00. Contact: ###-####. u/g for building ok 12/4/2002 10:46:54 AM
|
Rough-In Permanent Service | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | NR |
Jack Frank
|
|
|
ron ###-#### called electrical contractor, 11/27/2002 11:02:07 AM
|