Final | 1/14/2003 | 1/17/2003 | 1/17/2003 | A | PASS |
Pat Lass
|
|
|
###-#### matt
|
Electrical Rough-In | 12/25/2002 | 12/27/2002 | 12/27/2002 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 12/25/2002 at 23:42:01. Contact: ###-####.
ri/ok/cover 12/27/2002 10:23:57 AM
|
Electrical Rough-In | 12/18/2002 | 12/20/2002 | 12/20/2002 | P | FAIL |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 13:22:29. Contact: ###-####.
correction ko/seals& nail plates 12/20/2002 1:49:12 PM
|
Electrical Rough-In | 12/6/2002 | 12/9/2002 | 12/8/2002 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 13:27:46. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/08/2002 at 18:04:54.
|