Electrical Rough-In | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 7:59:06 AM. Contact: ###-####.
final/ok 2/18/2003 5:37:36 PM
|
Electrical Rough-In | 1/8/2003 | 1/8/2003 | 1/8/2003 | A | PASS |
Pat Lass
|
|
|
R/I Ok check water bonding with final inspection
|
Final | 1/7/2003 | 1/8/2003 | 1/8/2003 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/07/2003 at 15:31:26. Contact: ###-####.
|
Permanent Service | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PASS |
Tim McCullough
|
|
|
for uffer ground- for homeowner- ###-####- cortney
trench for grnd./ok 12/30/2002 3:35:41 PM
|