Final | 1/22/2003 | 1/23/2003 | 1/23/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/22/2003 at 13:59:22. Contact: ###-####. final ok no occupancy card at job site 1/23/2003 2:30:02 PM
|
Final | 1/20/2003 | 1/21/2003 | 1/21/2003 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/20/2003 at 14:56:54. Contact: ###-####. no access called 1/21/2003 8:48:03 AM
|
Electrical Rough-In | 1/9/2003 | 1/10/2003 | 1/10/2003 | A | NH |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 13:50:43. Contact: ###-####. called contr 1/10/2003 10:16:21 AM
|
Electrical Rough-In | 1/10/2003 | 1/10/2003 | 1/10/2003 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 10:08:24. Contact: .
|
Electrical Rough-In | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 09:24:36. Contact: ###-####.
|