Final | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/9/2003 at 1:16:12 PM. Contact: ###-####. ok final 4/10/2003 11:16:05 AM
|
Final | 4/7/2003 | 4/8/2003 | 4/8/2003 | A | NR |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 11:54:48 AM. Contact: ###-####. reispection fee do 4/8/2003 10:30:10 AM
|
Rough-In Permanent Service | 1/17/2003 | 1/21/2003 | 1/21/2003 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/17/2003 at 17:30:20. Contact: ###-####. r/i ok / p/s failed/ connect grd/grd to neutral/bonding jumper in sub panel 1/21/2003 10:13:33 AM
|