Final | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Pat Lass
|
|
|
peter Phone #: ###-####
|
Final | 10/12/2007 | 10/15/2007 | 10/15/2007 | A | NH |
Jack Frank
|
|
|
peter Phone #: ###-#### talked to owner
|
Electrical Rough-In | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | PASS |
Pat Lass
|
|
|
peter; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Electrical Rough-In | 3/4/2005 | 3/4/2005 | 3/4/2005 | P | FAIL |
Pat Lass
|
|
|
peter; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
box fill.
screws in nm boxes.
6 in free conductor.
protection of romex.
staples within 8 in.
recep required upstairs.
wire terminations. 3/4/2005 2:03:10 PM
|
Conference | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PART |
Pat Lass
|
|
|
peter-- ###-#### work still in progress--will be in a week or so
|
Electrical Rough-In | 1/14/2003 | 1/14/2003 | 1/14/2003 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/14/2003 at 06:48:46. Contact: ###-####.
ok for concrete
1/14/2003 9:05:40 AM
|
Permanent Service | 1/14/2003 | 1/14/2003 | 1/14/2003 | P | PASS |
Pat Lass
|
|
|
P/S U/G R OK 1/14/2003 12:54:18 PM
|
Electrical Rough-In | 1/13/2003 | 1/13/2003 | 1/13/2003 | P | NR |
Pat Lass
|
|
|
Had conf must get service changed within 24 hrs. requires U fer 1/13/2003 5:22:05 PM
|
Final | 1/13/2003 | 1/13/2003 | 1/13/2003 | P | PASS |
Joe Ray
|
|
|
###-#### peter conference on a concrete encased electrode 1/13/2003 2:14:12 PM
|