Final | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 3/19/2003 at 9:03:52 AM. Contact: ###-####.
|
Final | 3/11/2003 | 3/11/2003 | 3/11/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 9:42:55 AM. Contact: ###-####. cor. posted called 210.8 (B) gfci for all food prep areas, 110.2,3, U A C 107 tests, eguip in sushi bar area shall be labeled and listed could not find it counter top refer units, all from Japan 3/11/2003 3:24:45 PM
|
Electrical Rough-In | 3/4/2003 | 3/4/2003 | 3/4/2003 | A | PASS |
Tim McCullough
|
|
|
###-#### alan grid ceiling in kitchen and wall
ri/ok kit ceiling 3/4/2003 3:24:04 PM
|
Electrical Rough-In | 3/3/2003 | 3/3/2003 | 3/3/2003 | A | CANC |
Mike Kinnear
|
|
|
###-#### alan grid ceiling in kitchen and wall came late 3/3/02 pm changed it for am 3/4/02 3/4/2003 6:16:23 AM
|
Electrical Rough-In | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | PART |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 9:57:51 AM. Contact: ###-####.
ceilings all but kitchen,ok to cover 2/21/2003 2:57:52 PM
|
Permanent Service | 1/30/2003 | 1/31/2003 | 1/31/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 19:25:02. Contact: ###-####. p/s ug n ok 1/31/2003 10:16:22 AM
|
Electrical Rough-In | 1/27/2003 | 1/27/2003 | 1/27/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 1/27/2003 at 10:47:27 AM. Contact: ###-####. r/i walls only 1/27/2003 2:44:49 PM
|
Electrical Rough-In | 1/14/2003 | 1/15/2003 | 1/15/2003 | P | PASS |
Joe Ray
|
|
|
r\i and conf.; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|