Final | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 3/28/2003 at 6:40:04 AM. Contact: ###-####.
|
Electrical Rough-In | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PART |
Jack Frank
|
|
|
conference for mitch and tim 331 ok
|
Electrical Rough-In | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | PASS |
Tim McCullough
|
|
|
###-#### mitch
ri/ok 2/12/2003 3:55:28 PM
|
Permanent Service | 1/23/2003 | 1/23/2003 | 1/23/2003 | P | PASS |
Joe Ray
|
|
|
###-#### p/s ug n ok /// r/i not ready 1/23/2003 3:46:32 PM
|