Final | 3/17/2003 | 3/17/2003 | 3/17/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 7:34:32 AM. Contact: ###-####. ok card signed 3/17/2003 2:05:42 PM
|
Final | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/13/2003 at 7:50:23 AM. Contact: ###-####. cor. posted called needs lock out WH disconnect for door opener outlets for all show windows, #10 equip grd for WH, install phone equip clearence pane 3/13/2003 2:21:40 PM
|
Electrical Rough-In | 3/4/2003 | 3/4/2003 | 3/4/2003 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 7:25:24 AM. Contact: ###-####. office ceilings ok 3/4/2003 9:06:26 AM
|
Permanent Service | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/14/2003 at 8:33:27 AM. Contact: ###-####. p/s u/g rec. ok 2/14/2003 2:00:04 PM
|
Electrical Rough-In | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 10:44:54. Contact: ###-####. office walls and restrooms 1/30/2003 3:27:50 PM
|