Final | 3/26/2003 | 3/26/2003 | 3/26/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/26/2003 at 9:08:13 AM. Contact: ###-####. ok 3/26/2003 4:29:38 PM
|
Electrical Rough-In | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PASS |
Jack Frank
|
|
|
###-#### vivian trench u/g for lighting 3 locations ok 3/13/2003 3:56:14 PM
|
Electrical Rough-In | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | PART |
Jack Frank
|
|
|
trench vivian ###-#### ok 2/20/2003 1:33:30 PM
|
Electrical Rough-In | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Jack Frank
|
|
|
TRENCH; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung u/g ok 2/7/2003 3:28:24 PM
|
Electrical Rough-In | 2/7/2003 | 2/3/2003 | 2/7/2003 | P | PART |
Jack Frank
|
|
|
u/g for south end
|