Final | 2/26/2003 | 2/27/2003 | 2/27/2003 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 2/26/2003 at 1:54:18 PM. Contact: ###-####.
final/ok 2/27/2003 2:20:39 PM
|
Electrical Rough-In | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 6:18:47 PM. Contact: ###-####.
|