Final | 4/7/2003 | 4/8/2003 | 4/8/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 4:04:32 PM. Contact: ###-####.
|
Electrical Rough-In | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 7:35:20 AM. Contact: ###-####.
|