Final | 10/22/2003 | 10/23/2003 | 10/23/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/22/2003 at 9:31:48 AM.
|
Final | 10/15/2003 | 10/16/2003 | 10/16/2003 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 2:16:19 PM. Contact: ###-####. 210-52 kit counter 12 inches without a recpt 10/16/2003 1:05:00 PM
|
Final | 10/8/2003 | 10/8/2003 | 10/8/2003 | P | NR |
Joe Ray
|
|
|
|
ELE-Aging Inspection | 10/2/2003 | 10/2/2003 | 10/2/2003 | | NR |
Joe Ray
|
|
|
|
Electrical Rough-In | 4/28/2003 | 4/29/2003 | 4/29/2003 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 11:24:02 AM. Contact: ###-####. r/i ok 4/29/2003 9:28:32 AM
|
Electrical Rough-In | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 3:13:37 PM. Contact: ###-####.
300.4 4/25/2003 9:39:47 AM
|
Rough-In Permanent Service | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 3:14:13 PM. Contact: ###-####.
P/S U/G N Ok 4/25/2003 8:24:58 AM
|
Permanent Service | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PASS |
Joe Ray
|
|
|
Bob Feller is contact and has already arranged this inspection with Joe.; Phone #: ###-#### Internet Inspection Request from: David Lamarque grd electrode ok for cover 2/7/2003 3:52:48 PM
|