Final | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 2:30:34 PM. Contact: ###-####. ok final 4/30/2003 10:30:14 AM
|
Electrical Rough-In | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 4:08:32 PM. Contact: ###-####. contractor called in wrong PM# 4/4/2003 12:07:35 PM
|