Final | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/31/2003 at 8:24:45 AM. Contact: ###-####.
|
Final | 10/16/2003 | 10/16/2003 | 10/16/2003 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 10/16/2003 at 7:16:24 AM. Contact: ###-####.
checked pole lighting, final ok 10/16/2003 10:10:31 AM
|
Electrical Rough-In | 9/3/2003 | 9/3/2003 | 9/3/2003 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 7:53:04 AM. Contact: ###-####.
|
Final | 7/25/2003 | 7/25/2003 | 7/25/2003 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 8:47:55 AM.
signed T/O 7/25/2003 2:56:48 PM
|
Electrical Rough-In | 7/14/2003 | 7/15/2003 | 7/15/2003 | A | FAIL |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 3:14:10 PM. Contact: ###-####. tiles in stairtower not removed 7/15/2003 9:39:04 AM
|
Electrical Rough-In | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 10:51:04 AM. ceiling 7/15/2003 11:51:36 AM
|
Electrical Rough-In | 7/14/2003 | 7/14/2003 | 7/14/2003 | P | PART |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 8:58:28 AM. Contact: ###-####. remove tiles in stair ways., 1st floor ok, 2nd floor in hall ok. 7/14/2003 12:19:04 PM
|
Rough-In Permanent Service | 6/26/2003 | 6/26/2003 | 6/26/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 7:24:50 AM. Contact: ###-####.
P/S U/G N Ok 6/26/2003 11:15:37 AM
|
Electrical Rough-In | 6/12/2003 | 6/12/2003 | 6/12/2003 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 7:39:17 AM. Contact: ###-####.
trench ok 6/12/2003 1:51:23 PM
|
Electrical Rough-In | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 11:43:36 AM. Contact: ###-####. 2nd floor restrooms ceiling 6/3/2003 9:13:31 AM
|
Electrical Rough-In | 5/29/2003 | 6/2/2003 | 5/29/2003 | P | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 8:34:08 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 29 2003 8:35AM.
|
Electrical Rough-In | 5/29/2003 | 5/29/2003 | 5/29/2003 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 8:37:44 AM. Contact: ###-####.
walls down stairs 5/29/2003 5:00:27 PM
|
Electrical Rough-In | 5/28/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 6:54:40 AM. Contact: ###-####.walls only 5/28/2003 11:01:24 AM
|
Electrical Rough-In | 5/19/2003 | 5/21/2003 | 5/20/2003 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 12:11:42 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 20 2003 8:47AM.
|
ELE-Aging Inspection | 5/6/2003 | 5/6/2003 | 5/6/2003 | | NR |
Pat Lass
|
|
|
SUC 5/6/2003 12:23:38 PM
|
Electrical Rough-In | 3/4/2003 | 3/5/2003 | 3/5/2003 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 8:38:39 AM. Contact: ###-####. part u/g for core and shell only 3/5/2003 3:28:53 PM
|