Final | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 12:43:10 PM. Contact: ###-####.
|
Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 10:03:37 AM. Contact: ###-####.
|
ELE-Aging Inspection | 6/2/2003 | 6/2/2003 | 6/2/2003 | | NR |
Pat Lass
|
|
|
SUC 6/2/2003 9:32:01 AM
|
Electrical Rough-In | 4/2/2003 | 4/2/2003 | 4/2/2003 | P | PASS |
Jack Frank
|
|
|
DANA; Phone #: ###-#### Internet Inspection Request from: Darla Downs r/i ok for added recepts , light, moved switches and a/c circuit only contractor will correct box fill bath rm light box, and box in liv rm 4/2/2003 2:26:22 PM
|
Electrical Rough-In | 3/6/2003 | 3/6/2003 | 3/6/2003 | P | PASS |
Tim McCullough
|
|
|
DANA; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ri ok 3/6/2003 4:21:42 PM
|
Conference | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | DONE |
Pat Lass
|
|
|
###-####
|