Final | 7/15/2003 | 7/15/2003 | 7/15/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 6:54:15 AM. Contact: ###-####.
|
Permanent Service | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 4:00:33 PM. Contact: ###-####.
P/S U/G N Ok 3/12/2003 10:23:29 AM
|
Electrical Rough-In | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Joe Ray
|
|
|
roger ###-#### r/i ok p/s not ready 2/24/2003 4:13:34 PM
|