Final | 1/30/2004 | 2/2/2004 | 2/2/2004 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 1/30/2004 at 9:48:38 AM.
|
Electrical Rough-In | 10/22/2003 | 10/23/2003 | 10/23/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/22/2003 at 9:27:22 AM. p/s ug n ok 10/23/2003 2:06:10 PM
|
Rough-In Permanent Service | 10/22/2003 | 10/23/2003 | 10/23/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/22/2003 at 9:28:03 AM. p/s ug n ok 10/23/2003 2:06:38 PM
|
Permanent Service | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 3:10:51 PM. Contact: ###-####.
ufer/ok
3/12/2003 10:43:42 AM
|