Final | 12/5/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 9:12:17 AM.
|
Electrical Rough-In | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PASS |
Joe Ray
|
|
|
###-#### p/s ug n ok 8/6/2003 5:23:38 PM
|
Permanent Service | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 3/20/2003 at 10:32:40 AM. Contact: ###-####. 3/20/2003 2:45:25 PM ufer ok 3/20/2003 4:32:05 PM
|