Final | 3/20/2003 | 3/21/2003 | 3/21/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/20/2003 at 1:24:27 PM. Contact: ###-####.
T/S U/G Ok 3/21/2003 11:08:37 AM
|
Temporary Service | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | DONE |
Pat Lass
|
|
|
###-#### mike Johnson (this is located on the south west corner of stratavia and east table rock rd) back lot
|
Temporary Service | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | FAIL |
Pat Lass
|
|
|
###-#### mike Johnson (this is located on the south west corner of stratavia and east table rock rd) back lot
drive ground rod flush and GFCI protect recep 3/20/2003 12:45:21 PM
|