Final | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 5/2/2003 at 11:33:04 AM. Contact: ###-####.
final 5/5/2003 10:57:28 AM
|
Final | 4/29/2003 | 4/29/2003 | 4/29/2003 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 6:51:26 AM. Contact: ###-####.
suppliment water ground with 2 ground rods and 250.140 and bond both ends of pipe for GEC 4/29/2003 9:07:12 AM 4/29/2003 9:11:48 AM
|
Rough-In Permanent Service | 4/21/2003 | 4/21/2003 | 4/21/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/21/2003 at 6:47:24 AM. Contact: ###-####.
R/I In garage ok
P/S O/H N Ok 4/21/2003 10:20:24 AM
|
Electrical Rough-In | 4/2/2003 | 4/3/2003 | 4/3/2003 | P | PART |
Jack Frank
|
|
|
###-#### underground inspection ok from house to new garage 4/3/2003 3:08:02 PM
|