Final | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 5/7/2003 at 4:45:57 PM. Contact: ###-####.
final/ok 5/8/2003 3:34:37 PM
|
Rough-In Permanent Service | 4/10/2003 | 4/10/2003 | 4/10/2003 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/10/2003 at 10:35:19 AM. Contact: ###-####. r/i ok 4/10/2003 1:21:41 PM
|
Rough-In Permanent Service | 4/3/2003 | 4/10/2003 | 4/10/2003 | A | FAIL |
Jack Frank
|
|
|
###-#### cor. posted called 300.4(A)(1)and (D) see added p/s 4/9/2003 4:24:29 PM
|
Permanent Service | 4/9/2003 | 4/9/2003 | 4/9/2003 | P | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|