Final | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 8:21:37 AM. Contact: ###-####.
final/ok 6/13/2003 1:13:58 PM
|
Electrical Rough-In | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Jack Frank
|
|
|
bernice--reinsp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie r/i ok
p/s o/h new ok 4/10/2003 9:35:10 AM
|
Permanent Service | 4/10/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Jack Frank
|
|
|
p/s o/h new ok
|
Rough-In Permanent Service | 4/8/2003 | 4/9/2003 | 4/9/2003 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 2:21:45 PM. Contact: ###-####. 300.4(A)(1),and (D) met with contractor 4/9/2003 10:35:35 AM
|